info@propertyhaus.com
Property Haus,
No. 4, Triq Ninu Cremona
www.propertyhaus.com

Qala, Three-Bedroom Penthouse with Private Pool & Panoramic Views  

REF: HAUS-3112

€798,000

Details

Residential - Sale
Location: Qala
Property Type: Penthouse
Property Status: Off Plan
Agent Name: Christian Portelli
Phone: +35679598957

Description

Three-Bedroom Penthouse with Private Pool & Panoramic Views – Qala, Gozo
€778,000 | Fully Finished | Zero Emission Building
Located on the serene outskirts of Qala, just a short walk from the crystal-clear waters of Hondoq ir-Rummien, this stunning penthouse offers a rare opportunity to own a luxurious and sustainable home with sweeping views across Comino, Kemunett, and the Gozo coastline.
Designed for both comfort and eco-conscious living, this fully finished penthouse features generous interior spaces, a large private terrace with its own pool, and high-end finishes throughout — ideal for a full-time residence, holiday home, or premium rental investment.
Penthouse Highlights
  • Private pool with expansive terrace and deck area
  • Three spacious bedrooms and two bathrooms, including one en-suite
  • Open-plan living area designed for natural light and seamless indoor-outdoor living
  • Fully finished to a high standard with modern interiors and quality materials
  • Traditional stone façade crafted by master stonemasons
  • Air-conditioning, false ceilings, and elegant finishes throughout
Zero Emission Building – Sustainability Package Included
This development is designed to meet the highest standards of environmental performance:
  • Photovoltaic solar panels for renewable energy
  • Advanced insulation and double-glazed apertures
  • Heat pump water heating system
  • Greywater reuse system for secondary plumbing
  • Drinking water filtration system
  • Integrated waste separation system
Enjoy comfort and efficiency while reducing your environmental footprint.
Availability & Pricing
  • Three-Bedroom Penthouse with Private Pool€778,000
    (Only one unit available)
Construction Timeline
  • Shell Completion (Entire Block): December 2026 – March 2027
  • Full Completion (Including Units, Lifts & Common Areas): April – June 2028
    (Includes a 3-month buffer for potential delays)